In participating TMAs, the focus of Water Supply System includes:

    • System mapping and planning
    • Source identification, development, improvement, and augmentation
    • Raw water transmission, storage, and treatment
    • Treatment plant rehabilitation
    • Treated water storage, transmission, and distribution
    • Distribution network and service connection improvement
    • Leak detection and reduction; bulk and individual water metering
    • Water quality monitoring
    • Ground water testing
Area wise details
Sukkur
 
  • Two Distribution Network Zones --- Replacement of distribution network, household connections and associated investment in transmission lines, designed to provide 6,000 customers with 24 hour potable water supply initially as model zones.
  • Rehabilitation of Bunder Road treatment plant --- Rehabilitation of structures, replacement of filter media, replacement of indicators and gauges, fixing leaks around the 5 million gallons per day (MGD) capacity water treatment plant, installation of gas chlorination equipment.
  • Rehabilitation of Numaish treatment plant - R ehabilitation of structures, replacement of filter media, replacement of indicators and gauges, fixing leaks around the 3.5 MGD capacity water treatment plant, desludging of sedimentation tanks, desilting, provision of geomembrane, alum dosing and chlorination equipment
  • Rehabilitation of Airport Road treatment plant --- Desilting, alum dosing and chlorination equipment, installation of new 3 MGD rapid gravity filter, replacement of inlet and supply pumping stations
  • 10 standby diesel generator sets of different capacities totaling about 4,000 KVA
  • Installation of 6-inch mild steel pipe to connect low-pressure area of Soomra Mohalla to elevated reservoir at Adam Shah Hill. Replacement of one 18-inch mild steel main feeding elevated reservoir at Islamia College
  • Replacement of existing leaking and dilapidated 16-inch and 12-inch mains. Replacement of various smaller distribution lines
  • Leak detection program to reduce water losses
  • 12 bulk water meters at treatment plants and key points in system
  • Engineering design, construction supervision, and feasibility studies
  • Network Mapping
 
NEW Sukkur
 
  • Distribution Network Zone --- Replacement of distribution network, household connections, installation of domestic and commercial meters and associated investment in transmission lines, designed to provide 3,000 customers with 24 hours potable water supply initially as model zones.
  • Replacement of existing leaking and dilapidated 16-inch and 12-inch mains. Replacement of smaller distribution lines.
  • Overhead tank of 125,000 gallons for Distribution network improvement (DNI) zone
  • Network Mapping
 
ROHRI
 
  • Distribution Network Zone --- Replacement of distribution network, household connections, and associated investment in transmission lines, designed to provide 3,000 customers with 24 hours potable water supply initially as model zones.
  • Replacement of existing leaking and dilapidated water mains.
  • 15 tube wells with total capacity of 2.7 MGD, installation, pumping machinery and transmission line
  • 6 bulk water meters at treatment plants and key points in system
  • Engineering design and procurement oversight
  • Network Mapping
 
KHAIRPUR MIRS
 
  • Two Distribution Network Zones --- Replacement of distribution network, household connections, plus associated investment in transmission lines, designed to provide 6,000 customers with 24 hours potable water supply initially as a model.
  • Rehabilitation of existing Khaki Shah water treatment plant--- lining of inlet channel, de-sludging of sedimentation basins, rehabilitation of slow sand filters and pumping stations -- 1.5 MGD (Million Gallons per Day) capacity
  • Installation of rapid sand filters at Khaki Shah water treatment plant --- 2.5 MGD capacity
  • Rehabilitation of existing overhead tanks
  • Replacement of old and leaking mains
  • 8 bulk water meters at treatment plants and key system points
  • Engineering design, construction supervision, and feasibility studies
  • Network Mapping
 