Projects |
|
| |
| |
|
| Water Supply Management |
- Two Distribution Network Zones --- Replacement
of distribution network, household connections and associated
investment in transmission lines, designed to provide 6,000 customers
with 24 hour potable water supply initially as model zones.
- Rehabilitation of Bunder Road treatment plant --- Rehabilitation
of structures, replacement of filter media, replacement of indicators
and gauges, fixing leaks around the 5 million gallons per day (MGD)
capacity water treatment plant, installation of gas chlorination
equipment.
- Rehabilitation of Numaish treatment plant --- Rehabilitation
of structures, replacement of filter media, replacement of indicators
and gauges, fixing leaks around the 3.5 MGD capacity water treatment
plant, desludging of sedimentation tanks, desilting, provision of
geomembrane, alum dosing and chlorination equipment
- Rehabilitation of Airport Road treatment plant --- Desilting,
alum dosing and chlorination equipment, installation of new 3 MGD rapid
gravity filter, replacement of inlet and supply pumping stations
- 10 standby diesel generator sets of different capacities totaling about 4,000 KVA
- Installation
of 6-inch mild steel pipe to connect low-pressure area of Soomra
Mohalla to elevated reservoir at Adam Shah Hill. Replacement of one
18-inch mild steel main feeding elevated reservoir at Islamia College
- Replacement of existing leaking and dilapidated 16-inch and 12-inch mains. Replacement of various smaller distribution lines
- Leak detection program to reduce water losses
- 12 bulk water meters at treatment plants and key points in system
- Engineering design, construction supervision, and feasibility studies
- Network Mapping
|
|
| Waste Water Management |
- Preparation of strategic sanitation plans
|
|
| Solid Waste Management |
- Sukkur Cluster Landfill
--- Acquisition of
Land at Rohri,
construction of landfill
site, provision of all equipment
and cells for first 2 years
of operations.
- Sukkur Secondary
Collection ---
15 skip hoist vehicles,
105 skips, 90 platforms for
skips
- Engineering design and construction supervision of Landfill and collection sites.
- Environmental monitoring and mitigation
|
|
|
|
| |
| |
|
| Water Supply Management |
- Distribution Network Zone --- Replacement
of distribution network, household connections, installation of
domestic and commercial meters and associated investment in
transmission lines, designed to provide 3,000 customers with 24 hours
potable water supply initially as model zones.
- Replacement of existing leaking and dilapidated 16-inch and 12-inch mains. Replacement of smaller distribution lines.
- Overhead tank of 125,000 gallons for Distribution network improvement (DNI) zone
- Network Mapping
|
|
| Waste Water Management |
- Preparation of strategic sanitation plans
|
|
| Solid Waste Management |
- New Sukkur Secondary
Collection ---
5 skip hoist vehicles,
35 skips, 30 skip platforms
for SWM disposal at Rohri
Landfill site
- Environmental monitoring and mitigation
|
|
|
| |
|
| Water Supply Management |
- Distribution Network --- Replacement
of distribution network, household connections, and associated
investment in transmission lines, designed to provide 3,000 customers with 24 hours potable water supply initially as model zones.
- Replacement of existing leaking and dilapidated water mains.
- 15 tube wells with total capacity of 2.7 MGD, installation, pumping machinery and transmission line
- 6 bulk water meters at treatment plants and key points in system
- Engineering design and procurement oversight
- Network Mapping
|
|
| Waste Water Management |
- Preparation of strategic sanitation plans
- Installation of new pumping station
- Laying of new 700 meters of 12-inch sewer and 1,500 meters of 24-inch sewer.
- Shifting city sewage to Nara Canal --- Installation of a rising main and covered drains
- New disposal pump house.
- Funds for miscellaneous wastewater management improvements.
- Engineering design and construction supervision.
|
|
| Solid Waste Management |
- Sukkur Cluster Landfill
--- Acquisition of
Land, construction
of landfill site, provision
of all equipment and cells
for first 2 years of operations
- Rohri Secondary
Collection ---
3 skip hoist vehicles,
21 skips, 18 platforms for
skips
- Environmental monitoring and mitigation
|
|
|
| |
|
| Water Supply Management |
- Two Distribution Network Zones --- Replacement
of distribution network, household connections, plus associated
investment in transmission lines, designed to provide 6,000 customers
with 24 hours potable water supply initially as a model.
- Rehabilitation of existing Khaki Shah water treatment plant --- lining
of inlet channel, de-sludging of sedimentation basins, rehabilitation
of slow sand filters and pumping stations -- 1.5 MGD (Million Gallons
per Day) capacity
- Installation of rapid sand filters at Khaki Shah water treatment plant --- 2.5 MGD capacity
- Rehabilitation of existing overhead tanks
- Replacement of old and leaking mains
- 8 bulk water meters at treatment plants and key system points
- Engineering design, construction supervision, and feasibility studies
- Network Mapping
|
|
| Waste Water Management |
- Replacement of blocked sewers with covered drains
- Rebuilding of pumping stations based on waste water strategic plan
- Rehabilitation and expansion of stabilization ponds
- Provision of 6 dewatering equipments
- Provision of 5 Generators.
- Engineering design, construction supervision, and feasibility studies
|
|
| Solid Waste Management |
- Khairpur Landfill
--- Acquisition
of Land, construction
of landfill site, provision
of all equipment and cells
for first 2 years of operations
- Khairpur Secondary
Collection ---
8 skip hoist vehicles,
56 skips, 48 platforms for
skips
- Engineering design and construction supervision
- Environmental monitoring and mitigation
|
|
|
| |
|
|
| Waste Water Management |
- Preparation of strategic sanitation plans.
- Provision of 6 dewatering equipments
- Provision of 5 Generators
|
|
| Solid Waste Management |
- Shikarpur Landfill
--- Acquisition of
Land, construction of landfill
site, provision of all equipment
and cells for first 2 years
of operations
- Shikarpur secondary collection --- 9 skip hoist vehicles, 63 skips, 54 skip platforms
- Engineering design and construction supervision
- Environmental monitoring and mitigation
|
|
|
| |
|
|
| Waste Water Management |
| |
Larkana Drainage Master Plan |
|
- Priority work amounting to $ 4.85 Millions
- Comprehensive vertical funding from Federal Government amounting Rs.1 Billion for waste water
- PC-1 Under Review
|
|
| Solid Waste Management |
- Larkana landfill --- Acquisition of Land, construction of landfill site, provision of all equipment and cells for first 2 years of operations.
- Larkana Secondary
Collection ---
19 skip hoist vehicles,
133 skips, 114 skip platforms
- Engineering design and construction supervision
- Environmental monitoring and mitigation
|
|
|
|
|
|
|
|
| |
|
|