KEY PROJECTS
 
Sukkur
New Sukkur
Rohri
Khairpur Mir
Shikarpur
Larkana
 
 
   
  Projects  
 
 
Water Supply Management
    • Two Distribution Network Zones --- Replacement of distribution network, household connections and associated investment in transmission lines, designed to provide 6,000 customers with 24 hour potable water supply initially as model zones.
    • Rehabilitation of Bunder Road treatment plant --- Rehabilitation of structures, replacement of filter media, replacement of indicators and gauges, fixing leaks around the 5 million gallons per day (MGD) capacity water treatment plant, installation of gas chlorination equipment.
    • Rehabilitation of Numaish treatment plant --- Rehabilitation of structures, replacement of filter media, replacement of indicators and gauges, fixing leaks around the 3.5 MGD capacity water treatment plant, desludging of sedimentation tanks, desilting, provision of geomembrane, alum dosing and chlorination equipment
    • Rehabilitation of Airport Road treatment plant --- Desilting, alum dosing and chlorination equipment, installation of new 3 MGD rapid gravity filter, replacement of inlet and supply pumping stations
    • 10 standby diesel generator sets of different capacities totaling about 4,000 KVA
    • Installation of 6-inch mild steel pipe to connect low-pressure area of Soomra Mohalla to elevated reservoir at Adam Shah Hill. Replacement of one 18-inch mild steel main feeding elevated reservoir at Islamia College
    • Replacement of existing leaking and dilapidated 16-inch and 12-inch mains. Replacement of various smaller distribution lines
    • Leak detection program to reduce water losses
    • 12 bulk water meters at treatment plants and key points in system
    • Engineering design, construction supervision, and feasibility studies
    • Network Mapping
Waste Water Management
    • Preparation of strategic sanitation plans
Solid Waste Management
    • Sukkur Cluster Landfill --- Acquisition of Land at Rohri, construction of landfill site, provision of all equipment and cells for first 2 years of operations.
    • Sukkur Secondary Collection --- 15 skip hoist vehicles, 105 skips, 90 platforms for skips
    • Engineering design and construction supervision of Landfill and collection sites.
    • Environmental monitoring and mitigation
 
 
Water Supply Management
    • Distribution Network Zone --- Replacement of distribution network, household connections, installation of domestic and commercial meters and associated investment in transmission lines, designed to provide 3,000 customers with 24 hours potable water supply initially as model zones.
    • Replacement of existing leaking and dilapidated 16-inch and 12-inch mains. Replacement of smaller distribution lines.
    • Overhead tank of 125,000 gallons for Distribution network improvement (DNI) zone
    • Network Mapping
Waste Water Management
    • Preparation of strategic sanitation plans
Solid Waste Management
    • New Sukkur Secondary Collection --- 5 skip hoist vehicles, 35 skips, 30 skip platforms for SWM disposal at Rohri Landfill site
    • Environmental monitoring and mitigation
 
Water Supply Management
    • Distribution Network --- Replacement of distribution network, household connections, and associated investment in transmission lines, designed to provide 3,000 customers with 24 hours potable water supply initially as model zones.
    • Replacement of existing leaking and dilapidated water mains.
    • 15 tube wells with total capacity of 2.7 MGD, installation, pumping machinery and transmission line
    • 6 bulk water meters at treatment plants and key points in system
    • Engineering design and procurement oversight
    • Network Mapping
Waste Water Management
    • Preparation of strategic sanitation plans
    • Installation of new pumping station
    • Laying of new 700 meters of 12-inch sewer and 1,500 meters of 24-inch sewer.
    • Shifting city sewage to Nara Canal --- Installation of a rising main and covered drains
    • New disposal pump house.
    • Funds for miscellaneous wastewater management improvements.
    • Engineering design and construction supervision.
Solid Waste Management
    • Sukkur Cluster Landfill --- Acquisition of Land, construction of landfill site, provision of all equipment and cells for first 2 years of operations
    • Rohri Secondary Collection --- 3 skip hoist vehicles, 21 skips, 18 platforms for skips
    • Environmental monitoring and mitigation
 
Water Supply Management
    • Two Distribution Network Zones --- Replacement of distribution network, household connections, plus associated investment in transmission lines, designed to provide 6,000 customers with 24 hours potable water supply initially as a model.
    • Rehabilitation of existing Khaki Shah water treatment plant --- lining of inlet channel, de-sludging of sedimentation basins, rehabilitation of slow sand filters and pumping stations -- 1.5 MGD (Million Gallons per Day) capacity
    • Installation of rapid sand filters at Khaki Shah water treatment plant --- 2.5 MGD capacity
    • Rehabilitation of existing overhead tanks
    • Replacement of old and leaking mains
    • 8 bulk water meters at treatment plants and key system points
    • Engineering design, construction supervision, and feasibility studies
    • Network Mapping
Waste Water Management
    • Replacement of blocked sewers with covered drains
    • Rebuilding of pumping stations based on waste water strategic plan
    • Rehabilitation and expansion of stabilization ponds
    • Provision of 6 dewatering equipments
    • Provision of 5 Generators.
    • Engineering design, construction supervision, and feasibility studies
Solid Waste Management
    • Khairpur Landfill --- Acquisition of Land, construction of landfill site, provision of all equipment and cells for first 2 years of operations
    • Khairpur Secondary Collection --- 8 skip hoist vehicles, 56 skips, 48 platforms for skips
    • Engineering design and construction supervision
    • Environmental monitoring and mitigation
 
Water Supply Management
    • Ground Water Testing
Waste Water Management
    • Preparation of strategic sanitation plans.
    • Provision of 6 dewatering equipments
    • Provision of 5 Generators
Solid Waste Management
    • Shikarpur Landfill --- Acquisition of Land, construction of landfill site, provision of all equipment and cells for first 2 years of operations
    • Shikarpur secondary collection --- 9 skip hoist vehicles, 63 skips, 54 skip platforms
    • Engineering design and construction supervision
    • Environmental monitoring and mitigation
 
Water Supply Management
    • Ground Water Testing
Waste Water Management
 
    Larkana Drainage Master Plan
    • Priority work amounting to $ 4.85 Millions
    • Comprehensive vertical funding from Federal Government amounting Rs.1 Billion for waste water
    • PC-1 Under Review
Solid Waste Management
    • Larkana landfill --- Acquisition of Land, construction of landfill site, provision of all equipment and cells for first 2 years of operations.
    • Larkana Secondary Collection --- 19 skip hoist vehicles, 133 skips, 114 skip platforms
    • Engineering design and construction supervision
    • Environmental monitoring and mitigation

 

 
 
 